Gatwick Pumped Foul Drain

Gravity and Pumped Drainage Repair and Modification

  • Design and build contract with Gatwick Airport.
  • Project and construction management.
  • Survey – PAS 128 Type A, underground service survey to provide geo-location and report.
  • Intrusive buried asbestos pipework removal.
  • New pipework installation and access chamber installation.
  • Rehabilitation manholes and access chambers.
  • System test and commissioning with flow and pressure testing.
2025-02-17T15:36:18+00:00